Tuesday, March 25, 2014

Guest Bathroom Refresh - Jan - Mar 2014

Well, I should have started with a plan...



Instead, I decided that the grout needed to be replaced since it had not been sealed properly and I was tired of using bleach and a toothbrush.

 

This meant removing the toilet and cutting out the grout - Ryobi Job Tool

  

New Grout and Sealed tile

 

Now I realize that the trim and the door look really bad, so I paint the door and the trim. Then I realize the walls look like crap and I hate the medicine cabinet, so remove the medicine cabinet and I can paint the walls. Well, the previous owner though the best way to hang a medicine cabinet with Liquid Nails and screws into the drywall (thus the Liquid Nails). Result -


So now I have to repair that. Meanwhile, I realize I am going to have to paint the ceiling as well, so I should check out the ceiling vent. Yeah - that needs to be replaced as well.

 

Oh and since the toilet is out, I should replace it with a better one. The final list:

  • Replace ceiling vent
  • Replace toilet
  • Paint walls
  • Paint ceiling
  • Paint trim
  • Paint door
All because I wanted to replace the grout.

 





No comments:

Post a Comment